Here are the used gas turbine generator power plants available after their retreat from commercial operation.
1. There a combined cycle gas turbine power plant equipped with two units of PG6561. The gas turbine generator sets were made by GE China Joint Venture in 2000. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 110mw. Total running hour is about 1000 hours. The power plant is located in Liaoning China.
2. There is power plant equipped with one unit of combined cycle gas turbine generator set of PG6531 made by GE China Joint Venture in 1992. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 50mw Total running hour is about 35000 hours. The power plant is located in Guangdong China.
3. There is power plant equipped with one unit of combined cycle gas turbine generator set of PG6561 made by GE China Joint Venture in 2001. The fuel for the gas turbine is natural gas. Total capacity, including Steam turbine generator capacities, is about 56mw Total running hour is about 32000 hours. The power plant is located in Guangdong China.
4. There a combined cycle gas turbine power plant equipped with two units of PG6561. The gas turbine generator sets were made by GE China Joint Venture in 2000. The fuel for the gas turbine is Heavy Fuel Oil. Total capacity, including Steam turbine generator capacities, is about 110mw Total running hour is about 1000 hours. The power plant is located in Shanxi China.
5. There a combined cycle gas turbine power plant equipped with two units of PG6541. The gas turbine generator sets were made by GE USA in 2000. The fuel for the gas turbine is Heavy Fuel Oil or natural gas. Steam turbine, boiler were made by Chinese producers. Total capacity, including Steam turbine generator capacities, is about 100mw. Total running hour is about 25000 hours. The power plant is located in Jiangsu China.
6. There a combined cycle gas turbine power plant equipped with one unit of PG6541. The gas turbine generator sets were made by GE China JV in 1997. The fuel for the gas turbine is light diesel oil. Total capacity, including Steam turbine generator capacities, is about 50mw. Total running hour is about 10000 hours. The power plant is located in Zhejiang China.
7. There a combined cycle gas turbine power plant equipped with three units of PG6541 and PG6551 produced by GE China JV in 1994, 1995, 1996 respectively. The fuel for the gas turbine is Heavy Fuel Oil or natural gas or light diesel oil. Each set’s capacity including Steam turbine generator capacities, is about 50mw. Total capacity is bout 150mw. Total running hour is from 10000-20000 hours. The power plant is located in Jiangsu China.
8. There a combined cycle gas turbine power plant equipped with two units of PG6541 produced by France Alstom with steam turbine and boiler. The fuel for the gas turbine is Heavy Fuel Oil or light diesel oil. Total capacity including Steam turbine generator capacities, is about 100mw. Total running hour is from 25000 hours. The power plant is located in Guangdong China.
9. There a combined cycle gas turbine power plant equipped with two units of PG6581 produced by GE China JV in 2002 with steam turbine and boiler. The fuel for the gas turbine is Heavy Fuel Oil or light diesel oil. Each set’s capacity including Steam turbine generator capacities, is about 60mw. Total capacity is bout 120mw. Total running hour is from 20000 hours. The power plant is located in Guangdong China.
10. There a combined cycle gas turbine power plant equipped with ONE units of PG9171E produced by France Alstom. The fuel for the gas turbine is Heavy Fuel Oil or natural gas or light diesel oil. Single cycle capacity is about 123.4mw. and the Steam Turbine was produced by Harbin, with rated power of 56MW. Boiler was produced by Hangzhou. Total capacity is bout 180mw for the combined cycle plant. The power plant is located in Shandong China.
The quotation for these used gas turbine generator power is about 4298507.463 USD to 12537313.45 USD for each unit of Gas Turbine Generator with available used auxiliaries as where they are on site without warranty.
By additional contracts:
1. Dismantling, packing, and transportation to China ports.
2. We can also provide engineering of the plant to be installed with the used plant, supervision on installation and commissioning.
4. Maintenance and operation for the whole plant.
If you are interested in the used plant of gas turbine, please send us your documents on your projects to show us that your project is ready and financing is ready. And then we will send you detailed specification with picture of the plant.
We have successfully provide EPC contracting services for 4 units of used combined cycle PG6541 made by French Alstom from China to Ghana, including used equipments supply, dismantling, packing, transportation, overhaul, renovating, engineering, diagnosing, installing, and commissioning. Modification includes combustion system from HFO to natural gas, control system update from Mark IV to Mark VI.
Heat Efficiency and quotation on Chinese QD128 Gas turbine Combined cycle power plant
The efficiency of QD128 combined cycle power plant as I have sent you the proposal and specficication is about 40%m and the parasisitic power consumption is 450kw.
The quotation of the combined cycle power is about 6769230USD per unit, FOB China port, and of course it will change to technical and financing conditions. You are welcome to inspect our power plant projects in China by using our QD128 gas turbine generator which can use both gas and diesel oil as fuel.
|